Drăguț Pantelimon: who carries out the inspection and signs the report

A technical inspection report is worth exactly as much as the person who puts their name to it. This page says who that person is, what they built before inspecting and, just as importantly, what the company does not do.

Drăguț Pantelimon, civil engineer Drăguț PantelimonCivil engineer | Construction project manager | Founder of Verificare Tehnică Imobiliară

The engineer's training

A graduate of the Faculty of Civil, Industrial and Agricultural Buildings at the Technical University of Civil Engineering Bucharest, with six years of experience in construction, in execution and in project management. Execution experience is what counts in an inspection: someone who has coordinated masonry, plastering, screeds, joinery and installation routes knows where the deviations hide, because they know how they happen.

The company that issues the reports is DRG TECHNICAL MANAGEMENT S.R.L., tax ID (CUI) 54352618.

The instruments actually used

An instrument listed in a quote and an instrument used on site, with its limits stated in the report, are two different things. The instruments used for the measurements:

InstrumentWhat it measuresStated limit
Thermal imaging cameraSurface temperature distribution, thermal bridges, heating routes, damp areasDoes not see through walls. Needs a difference of at least 10 degrees between inside and outside
Contact moisture meterRelative moisture in the material, compared between areasDoes not measure moisture content by mass. Readings are affected by salts, density and reinforcement
Thermo-hygrometerAir temperature and relative humidityMeasures the air, not the material
2 m metal straightedge and feeler gaugesFlatness of walls, ceilings and floorsSays nothing about the overall flatness of a surface larger than 2 m
1.5 x 1.2 m set squareAngles of internal and external cornersA small square does not give a meaningful measurement for the corner of a room
Cross-line laser levelVerticality and level across the whole roomNeeds low light over long distances
Laser distance meterDimensions and floor areas, compared with the floor planLess precise on reflective or very dark surfaces
Wall scannerReinforcement, pipes and cables under the finishShows presence and approximate depth, not the exact diameter
Socket tester with residual current device testEarthing, polarity, tripping of the protectionDoes not replace a PRAM report issued by an authorised laboratory
Pressure gaugePressure in the plumbing and heating circuitsMeasures at the connection point, not in every branch
EndoscopeDucts, pipes and inaccessible spacesCovers only what is visible along the probe's path

Every report contains a chapter on the limits of the method. A report with no stated limits is a report that was not really done, and this is the first thing you can check in any technical document you receive from anyone, including us. The full model is public, in the sample report.

What the company does not do, stated explicitly

The company does not hold a certification from the ministry (MDLPA) and therefore does not, and cannot, issue technical expertises (expertiză tehnică). The distinction is not a formality; it is a legal one, and it matters to you:

Technical property inspectionTechnical expertise
Who can carry it outA civil engineer, with no certification requirementOnly a technical expert certified by the ministry, in the relevant field
What it producesA report of findings, with measurements, photos and the criteria citedAn expertise report, with conclusions and required solutions
What it is used forPurchase decisions, objections at handover, negotiation, a list of repairsSeismic risk classification, work on the load-bearing structure, procedures where the law requires an expertise
What it cannot doIt does not replace an expertise where the law requires oneIt is not needed for a check at the handover of an apartment

That is why the report is signed as a civil engineer (inginer constructor), not as a technical verifier (verificator tehnic) or a technical expert (expert tehnic). Anyone who uses titles close to the certified ones without holding them takes on a risk that we do not pass on to you.

The company does not carry out the work it records and has no contract with any developer or contractor on the projects it inspects. It is the only way a finding stays independent.

How a job runs, from booking to report

For an apartment with two or three rooms, the inspection takes between one and three hours. For a new apartment, it is booked at least three days before the handover date, so there is time to write up the list of objections and send it to the developer. The report is delivered within 24 hours, in Romanian or in English, whichever you choose, and contains numbered photos, measured values, thermal images where conditions allowed, a table of the regulations cited with the date each one was checked, and the list of objections ready to attach to the handover report (proces-verbal de predare-primire).

How you can check what is written here

Every legal citation in our published materials (in Romanian) carries the number of the act, the year, the amending act and the date on which it was checked. Each act has a declared status: checked, partial or not checked. Where we could not confirm an article against a primary source, the material says so instead of stating a figure. If you find an outdated reference or a wrong value, write to [email protected] and we will correct it, with a visible note of the update date.

Next step

Have a question about the property you are buying?

Tell us the type of property, its usable floor area (suprafață utilă) and where you are in the process. We reply on WhatsApp within 2 hours, Monday to Saturday, 08:00 to 20:00.

Call WhatsApp
Write to us on WhatsApp